That moment when you close the front door of your house and instantly realise you locked your car keys inside. That moment is extremely embarrassing. Especially when you have no way of getting back inside to your nearly complete new house that you shouldn't have been in anyway.
Yesterday, mrskidsbuggingme and I went to check out our house after the plumbers had been there during the day. We always do this to make sure that the house is secure. I noticed a window had been left open so climbed in to close it and make sure the rest of the house was also secure. All other doors/windows were good. Great, job done.
As I closed the front door I remembered my keys were on the kitchen bench.... doh! I haven't sworn that much in a long time. I'm pretty sure my kids picked up a few new words over the following few minutes.
mrskidsbuggingme called our site supervisor to see if he could help, and amazingly, he drove around at 6:30pm to get my keys out. I felt sooooooo tiny at that point. Over the past few weeks I've worked out he's a genuinely nice guy - I'm very grateful that he went quite a long way out of his way to help us.
I'm not sure there's a moral to the story other than, be nice to people.... and always, always make sure you have your stuff before you lock the door.
We're definitely getting our keys on the 21st. Pics to come. Can't wait!
Showing posts with label Lockup. Show all posts
Showing posts with label Lockup. Show all posts
Friday, 16 January 2015
Monday, 5 January 2015
Progress pictures
Stupid house. This is taking way too long.
There's very little work to do left:
We might have PCI this week, but maybe not, who knows... certainly not the builder.
There are many small cosmetic things to fix which we'll have the opportunity to point out at PCI e.g., scratched windows, paint splatter/damage on kitchen cabinets, paint touch ups, spa bath not being straight... ugggghhhhh.
Just about every tradie has done 90% of the job and then either messed something up or left something not finished.
Anyway, we can see that when things are finally fixed up the house will look great. Here's some pics:
There's very little work to do left:
- Driveway (must have cracked stormwater pipe fixed first)
- Shower screens
- Air conditioning grills (and cut out of the two they missed in the master bedroom)
- Shelving
- Carpet on a few stairs
- Gas to be hooked up (apparently they're busy for a few weeks, WTF!!! We can't wait any longer, nor should we have to!)
We might have PCI this week, but maybe not, who knows... certainly not the builder.
There are many small cosmetic things to fix which we'll have the opportunity to point out at PCI e.g., scratched windows, paint splatter/damage on kitchen cabinets, paint touch ups, spa bath not being straight... ugggghhhhh.
Just about every tradie has done 90% of the job and then either messed something up or left something not finished.
Anyway, we can see that when things are finally fixed up the house will look great. Here's some pics:
Labels:
Bathrooms,
Caesarstone,
Delays,
Kitchen,
Lockup
Tuesday, 28 October 2014
Lock up, Kitchen, other stuff...
Numerous little things have been happening at the house over the past week. It has seemed a little quiet to be honest but maybe that's because I'm used to being so busy in my own job.
Work currently under way and/or completed includes:
We spent a reasonable amount of money upgrading the kitchen. There are silly little costs that you don't find out until the kitchen appointment e.g., it costs to have two colours to cabinets, two different coloured benchtops, bulkhead above the rangehood. Some of the customisations include:
Upstairs hallway with feature doors to upper lounge:
Kitchen partially completed:
Pantry doors (hard to see in photo, but really nice finish/texture in person):
Powder room waterproofing:
Work currently under way and/or completed includes:
- Scaffolding removed
- Some doors have been hung and work is beginning on frames/architraves as well
- Kitchen and bathroom/laundry cabinets delivered and some installed
- Bathrooms waterproofed (don't know if this finished)
- Gyprock sanded
We spent a reasonable amount of money upgrading the kitchen. There are silly little costs that you don't find out until the kitchen appointment e.g., it costs to have two colours to cabinets, two different coloured benchtops, bulkhead above the rangehood. Some of the customisations include:
- Poly cupboards/drawers
- Extra pot drawers
- Soft close mechanisms
- Additional cabinets across the face of the sink part of the island bench
- Fitout of butlers pantry
- Window in butlers pantry
- Some cabinets we selected Laminex Burnished Wood in Nuance finish (it has a woodgrain texture)
- 40mm Caesarstone with a 70mm feature island bench (Osprey for most with Raven on the feature)
- Additional cabinet in feature island (the Majestic display wastes this storage space)
I've been following other people's building blogs for a long, long, long time and it feels surreal that we're finally at the stage where we nearly have a brand new house. We're almost ready to sell our existing house, and to be honest, it's pretty sad. mrskidsbuggingme, the two bugging kids and I will miss this place.
Hopefully I'll have another update later this week. In the meantime, here's some progress shots.
There is a lot of external painting to do:
Upstairs hallway with feature doors to upper lounge:
Kitchen partially completed:
Pantry doors (hard to see in photo, but really nice finish/texture in person):
Powder room waterproofing: