Wednesday 9 July 2014

Top floor frames assembled

Yesterday, the windows arrived, the electricity was hooked up, and some more ground level and ceiling work was completed.

Power meters reading 1kw/hr. Sadly, we get charged for power from here onwards:

Windows arrive:

Today, the top floor was assembled and some of the windows placed inside the house. It's amazing how quickly the house takes shape at the beginning of the build. So far, the build has been ticking along like clockwork. We spoke with the SS about the support for the steel beams at the back of the house and he was already aware of it - good to hear he's on top of things!

The front:


The kitchen:

View from what will be the ensuite spa:

View to what will be the balcony (dead Jacaranda to be removed):

The back: