Progress pictures

Stupid house. This is taking way too long.

There's very little work to do left:

  • Driveway (must have cracked stormwater pipe fixed first)
  • Shower screens
  • Air conditioning grills (and cut out of the two they missed in the master bedroom)
  • Shelving
  • Carpet on a few stairs
  • Gas to be hooked up (apparently they're busy for a few weeks, WTF!!! We can't wait any longer, nor should we have to!)


We might have PCI this week, but maybe not, who knows... certainly not the builder.

There are many small cosmetic things to fix which we'll have the opportunity to point out at PCI e.g., scratched windows, paint splatter/damage on kitchen cabinets, paint touch ups, spa bath not being straight... ugggghhhhh.

Just about every tradie has done 90% of the job and then either messed something up or left something not finished.

Anyway, we can see that when things are finally fixed up the house will look great. Here's some pics:










3 comments:

  1. Love! It looks great, the kitchen looks beautiful and how nice is the window above your spa. Not long to go now :)

    ReplyDelete
  2. Wow! It looks great.Almost complete. and don't stress too much you will be in before you know it, although I understand exactly how you feel definitely not a smooth process is it..Oh and they cracked our storm water pipe also during the driveway process, took them forever to repair we even moved in before it was fixed.

    ReplyDelete
  3. My email is bjc82@optusnet.com.au pls send me a reply have some questions i would like to ask

    Talk soon

    Regards

    Brett

    ReplyDelete